LG presented itself at the AD Design Summit in Munich. In view of the limited construction time and restrictions relating to the listed status of the building, several prefab displays were developed. The products were enclosed by atypical shapes and diagonal accents. The quality finish of the display mirrored the quality and exclusivity of LG’s products.
Client: LG (commissioned by sxces) | Where: Alte Kongresshalle – Munchen | Sector: Electronics | Total floorspace: 40 m2/431ft2